Motorola R-2002A Manual page 218

Communications system analyzer
Hide thumbs Also See for R-2002A:
Table of Contents

Advertisement

R2008D/R2010D OPERA TOR'S MANUAL
TABLE OF CONTENTS
PAG
1.0
INTRODUCTION
2.0
THE CELLULAR CONCEPT ................................................... .
3.0
4.0
4.1
4.2
TESTING CELLULAR MOBILES ............................................... .
4
A.
Unique signaling requirement
B.
Processor controlled transceiver
C.
666 channels
D.
SAT frequency checking
E.
Power level control
F.
Channel handoff
G.
NAM installation checking
H.
Manual control of the transceiver
THE R2008D/R2010DTEST CAPABILITIES .................................... ..
4
A.
Built-in signaling modem
B.
Single channel operation
C.
Cell initiated, mobile initiated, automatic, and manual test sequences
D.
SAT tone verification
E.
Signaling data verification
F.
Test progression indicator
G.
Frequency error, output power, and peak modulation measurements
H.
Error detection and readout
Setup instructions ........
i •••...•.•.....•.•.....••...•.•.......•................
5
A.
Signaling sequence
mo~e
B.
Manual mode
1
f
Accessing the cellular test mode ................................................... .
7
A.
Front panel control settings
B.
Setting up the duplex frequency
C.
Selecting the cellular test mode
1.
INITIAL PARAMETER ENTRY.. . .. . . .. . .. . . . .. .. . .. . . . . .. . .. . . . . . . .. ..
7
a. System identification (SID)
b. Mobile identification number (MIN)
c.
Forward control channel (FOCC)
i. Channel increment
ii. Printer option
2. CELL INITIATED TEST SEQUENCE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8
a. Call processing steps
b. Channel handoff
c.
Power level tests
d. Modulation level tests
3. MOBILE INITIATED TEST SEQUENCE............ . . . . . . . . . . . . . . . . . . . . .
10
a. Call processing steps
b. Channel handoff
c.
Power level tests
d. Modulation level tests
e.
Dialed telephone number
4. MANUAL TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11
a.
Command Entry
b. Command List
i. Input and output descriptions
c.
Examples of use
5. AUTOMATIC TEST SEQUENCE........................................
l3
a. Test initialization
b. Test output
c.
Printer operation

Advertisement

Table of Contents
loading

This manual is also suitable for:

R-2001a

Table of Contents