Moving And Storage; Initial Inspection; Location; Blower Configurability - Bosch LM Series Installation, Operation And Maintenance Manual

Hide thumbs Also See for LM Series:
Table of Contents

Advertisement

LM Series Heat Pump
2
Figure # 2 Left-Hand Unit (Right-Hand Unit is opposite view)
[1] Air handler access panel
[2] Condensing section access panel
[3] Condensate drain connection
[4] Water connection
[5] Electrical connection knockout
[6] Electric Heat electrical connection knockout
(Optional)
[7] Blower outlet (Supply Air)
[8] LED Error Code

MOVING AND STORAGE

If the equipment is not needed for immediate
installation upon its arrival at the job site, it should
be left in its shipping carton and stored in a clean,
dry area. Units must only be stored or moved in the
normal upright position as indicated by the "UP"
arrows on each carton at all times.
Revised 09-13
5
2
4
7
6
1
For storage If unit stacking is required,
stack units as follows:
Do not stack 6 ton units!
Vertical units: less than 6 tons, no more
than two high.
Horizontals units: less than 6 tons, no more
than three high.
8

INITIAL INSPECTION

Be certain to inspect all cartons or crates on each
unit as received at the job site before signing the
freight bill. Verify that all items have been received
and that there are no visible damages; note any
shortages or damages on all copies of the freight
bill. In the event of damage or shortage, remember
that the purchaser is responsible for filing the
necessary claims with the carrier. Concealed
damages not discovered until after removing the
units from the packaging must be reported to the
carrier within 24 hours of receipt.

LOCATION

Locate the unit in an indoor area that allows easy
removal of the filter and access panels, with
enough room for service personnel to perform
maintenance or repair. Provide sufficient room to
make fluid, electrical, and duct connection(s). If
the unit is located in a confined space such as a
3
closet, provisions must be made for return air to
freely enter the face of unit's air coil. On horizontal
units, allow adequate room below the unit for a
condensate drain trap and do not locate the unit
above supply piping.
These units are not approved for outdoor
installation; therefore, they must be
installed inside the structure being
conditioned. Do not locate in areas that are
subject to freezing.

BLOWER CONFIGURABILITY

To change configuration of the LM unit requires
the purchase of a separate Blower panel
Conversion Kit. Please refer to the Spare Parts
List_8733911143 (On website
and the Blower Configurability IM_8733911121.
Moving and Storage | 5
)
www.fhp-mfg.com
8 733 905 315 (2013/9)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lm024Lm060Lm048Lm070Lm036

Table of Contents