Project Planning Information; Selecting The Auxiliary Valves - Honeywell TC Series Technical Information

Tightness controls, adjustable test period which can be adapted to different systems, adjustable test instant allows quick system start, maximum safety thanks to self-monitoring electronics
Table of Contents

Advertisement

Project planning information

200
500
400
300
100
200
80
60
50
40
100
90
80
30
70
60
20
50
40
30
10
8
20
6
5
4
10
1
10
20
2
5 6 7
8
10
3
10
1
300
500
 = natural gas ρ = 0.8 kg/m
 = propane ρ = 2.01 kg/m
 = air ρ = 1.29 kg/m
TC · Edition 08.17
30
40
50
80
100
200
20
30
40
50
80
100
20
30
40
50
80
100
200
1000
2000
4000 6000
10000
3
(0.05 lbs/ft
3
(0.13 lbs/ft
3
(0.08 lbs/ft
3
)
300
500
1000
2000
200
300
500
1000
300
500
1000
2000
20000
40000
100000
3
)
3
)
5 Project planning information
On slow opening valves without
start rate or pneumatically oper-
ated valves, the test volume can be
supplied or discharged via auxiliary
valves, if discharge into the furnace
chamber is impossible for process
reasons.
5 .1 Selecting the auxiliary
valves
Example:
V
= 32.45 l (8.44 gal),
P
p
= 50 mbar (19.5 "WC).
u
Selecting auxiliary valve V1:
selected ⇒ VAS 110.
The valve is sufficiently large to vent
the pipe between the valves.
4000 6000
2000
3000
3000
V
[ l ]
P
V
[ft
3
]
P
38

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 1Tc 1vTc 1cTc 2Tc 3Tc 4

Table of Contents