Commissioning a project

6.1

Overview

Configuration phase
A project – the process image of the working process – is produced during configuration to
visualize automated working processes. The process displays for the project contain
displays for values and alarms which provide information about process statuses. The
process control phase follows the configuration phase.
Process control phase
The project must be transferred to the HMI device if it is to be used in process control.
Another prerequisite for process control is that the HMI device is connected online to a
controller. Current working processes - operating and observing - can then be subject to
process control.
Transferring the project to the HMI device
You can transfer a project to an HMI device as follows:
● Transfer from the configuration PC
Commissioning and recommissioning
Initial commissioning and recommissioning differ in the following respects:
● When the HMI device is commissioned for the first time, there is no project at first.
The HMI device is also in this state after the operating system has been updated.
● When recommissioning, any project already on the HMI device is replaced.
6.2

Operating modes

Operating modes
The HMI device may be in the following operating modes:
● Offline
● Online
● Transfer