Procedure When Commissioning - Siemens SIMOTION D410 Commissioning Manual

Hide thumbs Also See for SIMOTION D410:
Table of Contents

Advertisement

5.1.2

Procedure when commissioning

Commissioning steps
This chapter describes the steps in configuring the plant and testing the configured stand-alone
drive and axis. The steps in commissioning are listed below in the order as recommended:
1. Configuring SINAMICS Integrated
2. For information on testing a configured drive, see Section Testing the configured drive using
3. For information on creating an axis, see Section Overview of SIMOTION Engineering
4. For information on testing a configured axis, see Section Testing an axis with the axis
5. Set up addresses and telegrams, for details see Section Setting up addresses and message
6. For information on integrating an additional encoder (optional), see Section Integrating
7. Configuration of drive-related I/Os (with symbolic assignment), see Section Configuring
8. Configuration of the technology objects and I/O variables, see Section Configuring
9. For information on optimizing the drive and controller, see Section Optimizing the drive and
When carrying out this procedure, consult the relevant references.
This chapter also contains additional configuration information, e.g. for vector drives, Safety
Integrated, etc.
SIMOTION D410
Commissioning Manual, 04/2014
The integrated drive SINAMICS Integrated can be configured in offline or online mode:
– For information on offline configuration, see Section Configuring the system in offline
mode (Page 81).
All components and their order number must be known for the offline configuration.
– For information on online configuration, see Section Performing an online
configuration (Page 93).
During online configuration, you can load all of the information from the connected
DRIVE-CLiQ components to your user project.
the drive control panel (Page 108).
(Page 110).
control panel (Page 118).
frames (Page 120)
additional encoders (optional) (Page 125).
drive-related I/Os (with symbolic assignment) (Page 131)
technology objects and I/O variables (Page 134)
controller (Page 142).
Commissioning (software)
5.1 Overview of commissioning