Maintenance Schedule - Billy Goat QL2000VE Operator Owner's Manual

Ql series truck loader vacuum
Table of Contents

Advertisement

MAINTENANCE

Maintenance Schedule

Maintenance Operation
Engine (See Engine Manual)
Inspect battery for damage or leak
Check battery terminal for corrosion
Check for excessive vibration
Clean Hose
Keep engine free of debris
Inspect for loose parts
Inspect for worn or damaged parts
MAINTENANCE HISTORY
Date of Service
Hose must be installed and switch
lever must engage switch for engine
Part No. 790161
continued
Follow these hourly
maintenance intervals.
Every
Every 5
Every
Every
Use
hrs or
10 hrs
25 hrs
(Daily)
Service Performed
to start.
Page 9 of 12
INTERLOCK SYSTEM
Hose coupler assy (item no.36) must be installed, as shown in Fig. 8, to
operate the unit. When the switch is depressed one circuit is opened so
engine is not grounded out and other circuit is closed to enable starter and
fuel pump.
Fig. 8
Fig. 7
Form No. F032399A

Advertisement

Table of Contents
loading

Table of Contents

Save PDF