AeroLift 35
Environmental Air Space Housings, Closures & Ceiling Trim Kits

Installing Optional Environmental Air Space Housing

The Environmental Air Space Housing is shipped pre-assembled in its shortest
position. The height of the housing can be adjusted by moving the screws to differ-
ent mounting holes in side panels. The incremental adjustment for the top screw
and bottom screw is ½"; the incremental adjustment for the rest of the screws is 1".
You can install the housing in a pre-assembled state or as separate components,
which will require that the housing be completely disassembled prior to installation.
Please note that if the Environmental Air Space Housing is to be installed in a
space where there is no access from above the housing, then it is recommended
that the AeroLift 35 be installed to the upper section prior to installing the housing.
It is also recommended that an access panel be installed to allow future access.
1 Install top section of housing using outer
four holes located on top of upper section.
If installing large housing, make sure it is
oriented properly to allow correct
placement of lift within housing.
2 If installing the large closure, attach
brackets to bottom of projector plate.
3 Attach AeroLift 35 to upper section of
housing through the inner four holes
in the upper section with the
/
5
16
hex head screws,
/
" flat washers and
5
16
lock nuts provided with housing. The lock
nuts should be used above the housing
(one per screw).
4 Attach the two flat panels of the middle
section across from each other with the
clinch nuts to the outside of the housing.
5 Attach the two middle section panels with
the formed ends across from one another.
6 Attach lower section of Environmental
Air Space Housing.
Video Conferencing Camera Shelf
Ceiling Trim Ring 23
EASH Mounting Holes 21¼"
Closure Panel 25"
Lipless Closure Dims: 22
EASH 23 ½"
Side View
Ceiling Trim Ring 23
EASH 23 ½"
EASH
EASH
TRIM RING
Center of Rod
21"
Between Rod
9
/
"
3
8
to
20
11
/
14
/
"
3
16
8
22
"
5
/
8
CLOSURE PANEL
1
9
/
"
Closure Panel 25"
16
14
9
/
"
16
Closure Panel 16
7
/
"
8
Copyright ©2016 Draper, Inc.
Environmental Air Space
Housing (small, collapsed)
" –18 x
/
"
7
8
A - Upper Section
B - Middle Section
(Inside View)
C - Lower Section
(Ceiling Trim Kit)
(AeroLift 35 Only)
Top View
7
/
"
8
Lift
Closure
Mounting
10
/
"
1
Panel
8
Holes
5
15
/
"
8
Ø
7
/
" 4x
16
3
19
/
"
8
1
/
" x 12
1
/
"
8
8
EASH 14 ¼"
Front/Back View
Ceiling Trim Ring
14
9
/
"
7
/
"
8
16
EASH 14 ¼"
EASH
12
"
5
/
8
to
EASH
20
5
"
/
8
TRIM RING
Center
Trim
of Rod
Ring
10
1
/
"
8
Between
Closure
Rod
"
9
/
"
Panel
9
7½"
16
3
13
/
"
16
Closure Panel
11
9
/
"
5
16
15
/
"
8
13
7
/
"
Closure Panel
8
Form AeroLift35-Options_Inst16
Small Environmental Air Space Housing
Ceiling Trim Ring 23
Closure Panel 25"
Large Environmental Air Space Housing
Lipless Closure Dims: 22
Side View
/
"
11
16
Ceiling Trim Ring 23
EASH 23 ½"
Center of Rod
Between Rod
Closure Panel 25"
If you encounter any difficulties installing your AeroLift 35 Environmental
Air Space Housing, Closure or Ceiling Trim Kit, call your dealer or Draper,
Inc. in Spiceland, Indiana, 765-987-7999 or fax 765-987-7142.
Printed in U.S.A.
and Closure Dimensions
Top View
Ceiling Trim Ring 23
7
/
"
8
EASH Mounting Holes 21¼"
Lift
Closure
Mounting
10
/
"
1
Panel
8
Holes
15
7
Ø
/
" 4x
16
3
19
/
"
8
Closure Panel 25"
Lipless Closure Dims: 22
1
/
" x 12
1
/
"
8
8
Side View
Front/Back View
Ceiling Trim Ring
14
7
/
"
8
EASH 23 ½"
EASH 14 ¼"
12
"
5
/
8
to
EASH
EASH
20
"
5
/
8
Center
Center of Rod
Trim
of Rod
21"
Ring
Between Rod
Between
Closure
20
"
11
/
16
Panel
22
5
"
13
/
8
Closure Panel
15
and Closure Dimensions
Top View
Top View
Ceiling Trim Ring 23
7
/
"
8
7
Ceiling Trim Ring 23
/
"
EASH Mounting Holes 20
5
/
"
8
8
EASH Mounting Holes 20
5
/
"
8
3
Ø
/
" 8x
8
Ø
3
/
" 8x
8
Lift
Closure
Lift
Mounting
Panel
10
1
/
"
Mounting
8
Holes
10
1
/
"
8
25"
Holes
19
3
/
"
8
19
3
/
"
8
Closure Panel 25"
Closure Panel 25"
1
1
/
" x 22
/
"
8
8
Lipless Closure Dims: 22
1
/
" x 22
8
Front/Back View
Side View
7
/
"
Ceiling Trim Ring 23
8
7
Ceiling Trim Ring 23
/
"
8
EASH 23 ½"
EASH 23 ½"
12
5
"
/
EASH
8
12
"
5
/
to
EASH
8
to
20
"
5
/
8
20
5
"
/
8
Center of Rod
Trim
Center of Rod
21"
Trim
Ring
21"
Ring
Between Rod
Closure
Between Rod
20
11
"
/
Closure
16
Panel
20
"
11
/
Panel
16
22
"
5
/
8
22
5
"
/
8
Closure Panel 25"
Closure Panel 25"
5
/
"
8
9
/
"
16
10
1
/
"
8
Rod
9
/
"
9
16
3
/
"
16
5
/
"
8
Closure
Panel
25"
1
/
"
8
Front/Back View
7
/
"
8
7
Ceiling Trim Ring 23
/
"
8
EASH 23 ½"
EASH
EASH
Center of Rod
21"
21"
Between Rod
20
11
"
/
16
20
11
"
/
16
22
"
5
/
8
22
5
"
/
8
Closure Panel 25"

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AeroLift 35 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Draper AeroLift 35

  • Page 1 Ceiling Trim Ring 23 " that the AeroLift 35 be installed to the upper section prior to installing the housing. EASH Mounting Holes 21¼" It is also recommended that an access panel be installed to allow future access.
  • Page 2 Installing Optional Ceiling Trim Kit Draper’s optional Universal Projector The AeroLift 35 is available with a ceiling trim kit, which consists of the lower Mount will hold up to 26 lbs. section of the Environmental Air Space housing and optional closure panel.

Table of Contents