00. CONTENT 01. SAFETY INSTRUCTIONS INDEX STANDARDS TO FOLLOW 01. SAFETY INSTRUCTIONS ATTENTION: STANDARDS TO FOLLOW This product is certified in accordance with European Community (EC) safety standards. 02. OPERATOR CONNECTION SCHEME This product complies with Directive 2011/65/EU of the European Parliament and of the Council, INSTALLATION MAP of 8 June 2011, on the restriction of the use of certain hazardous substances in electrical and electronic equipment.
Page 3
02. OPERATOR 02. OPERATOR CONNECTION SCHEME TECHNICAL SPECIFICATIONS 230V • Max. weight of gate 500Kg • Max. width of gate 2,50m • Motors power supply 24V DC 230V AC 2x1,5mm2 (24V DC) • Motor power 280W 4x1,5mm2 (230V DC) • Motor RPM 1800 1400 2x0,75mm2...
Page 4
03. INSTALLATION 03. INSTALLATION GATE WING OPENING ANGLE BOX INSTALLATION Establish the required opening angle. POSITION PILLAR Dig a hole big enough to hold 1 • the box containing the operator 375mm (C1). 320mm INTERNAL VIEW 90° Insert the tube for water 2 •...
Page 5
03. INSTALLATION 03. INSTALLATION ASSEMBLING THE OPERATOR AND LEVERS FASTENING THE OPERATOR LEVER TO THE GATE 1 • Insert the motor into the foundation case and fixit with nuts and washers supplied. Insert the cover and fasten it with the screws provided Position.
Page 6
03. INSTALLATION 04. TROUBLESHOOTING EMERGENCY RELEASE PROCEDURE FINAL CONSUMERS AND SPECIALIZED INSTALLERS INSTRUCTIONS Insert the key C provided into the Problem Probable cause Solution appropriate hole on the lever L1 and turn the key. • 230V mains voltage absent • Check master switch •...