Reference Manual
00809-0500-4410
2. While holding the lever downwards, place the Gateway so it rests the top lip of the
3. Release the DIN rail lever, and make sure the Gateway is secured.
4. To remove the unit, press the DIN rail lever, and hold while pulling the bottom half
5. Release the lever, and lift the Gateway away from the DIN rail.
3.4
Installing the 781 Field Links
3.4.1
Intended use
The Field Link must be used in conjunction with a network manager or network Gateway.
The Field Link then functions as a translator between the wired network and a wireless field
network.
Figure 3-2: System Architecture Example
Emerson.com/Rosemount
bigger chassis on the DIN rail.
Figure 3-1: Installing
of the Gateway from the DIN rail.
Figure 3-2
shows one of the networks being used.
Installation
February 2019
21