Figure 3-2. Removing and Installing a Full-Height Blade
2
1
1
blade handle
3
blade
5
guide rail on blade
Installing a Blade
1 If you are installing a new blade, remove the plastic cover from the I/O
connector(s) and save for future use. See Figure 3-3.
2 Orient the blade so that the handle is on the left side of the blade.
98
Installing Blade Components
3
2
release button
4
guide rail on M1000e enclosure
4
5