Siemens SIMATIC TIM 3V-IE DNP3 System Manual page 324

Industrial remote communication telecontrol
Table of Contents

Advertisement

Accessories
A.3 Connecting cables
Image A-6
Image A-7
Connecting cables for connecting to Ethernet
For the Ethernet attachment of the TIM 4R-IE DNP3, you can use the suitable Ethernet
connecting cables (for example IE TP Cord) from the SIMATIC NET product range (catalog
IK PI).
If a DNP3 TIM is connected to a hub, switch or router, it is advisable to use fully shielded
straight-through patch cables with RJ-45 connectors and 1:1 pin assignment. The cable must
be suitable for the 10Base-TX or 100Base-TX specification.
Two DNP3 TIMs can also be connected over Ethernet as a point-to-point link using a
crossover patch cable with RJ-45 connectors at both ends and the following pinout:
324
Assembly of the standard connecting cable 6NH7701-4BN
Assembly of the standard connecting cable 6NH7701-0AR
System Manual, 12/2015, C79000-G8976-C253-04
TIM DNP3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic tim 4r-ie dnp3Tim 3v-ie dnp3Tim 4r-ie dnp3

Table of Contents