Site Preparation Check-List - Agilent Technologies 4100 Site Preparation Manual

Microwave plasma atomic emission spectrometer
Hide thumbs Also See for 4100:
Table of Contents

Advertisement

Site Preparation Check-list

I have prepared:
Accessories
All preparations have been completed. Please arrange for the
installation to be completed as soon as possible. I understand that if
the installation site is not prepared in accordance with the enclosed
instructions, additional installation charges may be applicable.
Company name and address:
Name:
Position:
Telephone:
Preferred Installation date:
Signed:
Agilent 4100 Microwave Plasma Atomic Emission Spectrometer Site Preparation Guide
Exhaust system
Gas supplies
Nitrogen (separate supplies for the MP-AES and EGCM)
Air (separate supplies for the MP-AES and nitrogen
generator)
Argon
Electrical power supplies
Power connections
Personal computer with Windows 7 64-bit operating system
installed and printer
Waste container
Cooling air system (if required)
SPS 3 – Sample Preparation System
EGCM – External Gas Control Module – including gas supplies
Monochromator Optics Purge – including gas supplies
Agilent 4107 Nitrogen Generator – including gas supplies
Date:
Introduction
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents