FD 100/320Gbps NT and FX NT IHub Services Guide
3.6.1
Before the services are provisioned, the following tasks should be completed:
•
•
•
•
3.6.2
Perform preliminary policy configurations and SDP configurations to control traffic
flow, operator access, and to manage fault conditions and alarm messages.
3.6.3
•
•
3.7 Configuration Notes
This section describes service configuration caveats.
3.7.1
Service provisioning tasks can be logically separated into two main functional areas,
core tasks and subscriber tasks and are typically performed prior to provisioning a
subscriber service.
Core tasks include the following:
•
•
•
Subscriber services tasks include the following:
•
•
•
Issue: 13
Phase 1: Core Network Construction
Build the IP or IP/MPLs core network.
Configure routing protocols.
Configure MPLS LSPs (if MPLS is used).
Construct the core SDP service tunnel mesh for the services.
Phase 2: Service Administration
Phase 3: Service Provisioning
Provision customer account information.
Provision the customer services on the ISAM by defining SAPs, and then by
binding the service to appropriate SDPs as necessary.
General
Create customer accounts
Create LSPs
Create SDPs
Create Epipe, VLL, IES, VPLS, or VPRN services
Configure interfaces (where required) and SAPs
Bind SDPs
3HH-11985-AAAA-TQZZA
Services Overview
53