Chapter 2 Installation; Package Contents; Safety Precautions - TP-Link TL-R480T+ Installation Manual

Load balance broadband router
Hide thumbs Also See for TL-R480T+:
Table of Contents

Advertisement

Chapter 2 Installation

2.1

Package Contents

Make sure that the package contains the following items. If any of the listed items is
damaged or missing, please contact your distributor.
One Router
Two mounting brackets, eight
screws and four rubber feet.
2.2

Safety Precautions

To avoid any device damage and bodily injury caused by improper use, please observe
the following rules.
Safety Precautions
Keep the power off during the installation.
Wear an ESD-preventive wrist strap, and make sure that the wrist strap has a good skin
contact and is well grounded.
Use only the power cord provided with the router.
Make sure that the supply voltage matches the specifications indicated on the rear
panel of the router.
Ensure the vent hole is well ventilated and unblocked.
Do not open or remove the cover of the router.
Before cleaning the device, cut off the power supply. Do not clean it by the waterish
cloth, and never use any other liquid cleaning method.
Site Requirements
To ensure normal operation and long service life of the device, please install it in an
environment that meets the requirements described in the following subsection.
O n e Powe r C o rd a n d O n e
Ethernet Cable
Load Balance Broadband Router
This Installation Guide
Installation
03

Advertisement

Table of Contents
loading

Table of Contents