Download  Print this page

Kawasaki 1400GTR ABS 2014 Owner's Manual Page 227

Hide thumbs

Advertisement

226
MAINTENANCE AND ADJUSTMENT
A. Projections
B. Battery Tray
C. Holes
D. Battery Compartment
Connect the battery positive (+) ca-
ble to the positive (+) terminal, and
then install the battery negative (–)
lead and battery negative (–) cable
to the frame.
Tighten the bolt to the specified tor-
que.
Tightening Torque
Frame Ground Terminal Bolt:
8.0 N·m (0.82 kgf·m, 71 in·lb)
A. Battery Positive (+) Cable
B. Battery Negative (–) Lead
C. Battery Negative (–) Cable
D. Outside
E. Frame Ground Terminal Bolt

Advertisement

Table of Contents

Comments to this Manuals

Symbols: 0
Latest comments: