Installation checklist

Table 7-2 Checklist

Item
no.
1
Equipment is not damaged.
2
Air flow clearance requirements
are met.
Door opening clearance
requirements are met.
3
If indoor installation; GAP rack
is securely mounted to floor.
If outdoor installation; GAP
cabinet(s) is securely mounted to
floor or concrete slab.
If outdoor installation; GAP
cabinet(s) that are stacked are
securely mounted together.
If outdoor installation; GAP
cabling and conduit between
cabinets meet local code
requirments (for utility power),
and are installed correctly.
Flexible and rigid conduit is not
stressed.
4
BCU and RF Carrier Unit (RFCU)
are RF cabled correctly.
5
BCU and RFCU are DC power
cabled correctly.
6
BCU is ethernet cabled
(if installed).
Fiber optic, power and RF (if
required) cable between RF head
and GAP is installed correctly.
7
RF head is securely mounted to
pole.
RF head is correctly cabled.
8
Band pass filters are cabled to
RFCU correctly (if used).
9
Conduit is sufficiently grounded.
10
Antennas are grounded to tower.
11
The antenna cables are protected
by lightning arrestors (if
applicable).
12
GAP is grounded.
7-6
Item
PRELIMINARY - UNDER DEVELOPMENT
Chapter 7: What's Next and Cleanup
Notes
68P09286A73-1
Continued
JUL 2007