Introduction; Clean Up The Site; Installation Checklist; Optimize The System - Motorola MOTOwi4 25600 Hardware Installation

2.5ghz diversity access point, ground based access point gap
Table of Contents

Advertisement

Introduction

Introduction
This section describes general information regarding the final steps of the installation.
These are:

Clean up the site

Fill out the installation completion checklist

Optimize the system

Clean up the site
Clean up the site by following the information given in the

Installation checklist

After the site is cleaned up, fill out the installation completion checklist. This checklist is located
in the
Installation Completion Checklist
Optimize the system
Optimize the system by following the procedures given in the appropriate optimization and
other associated manuals (product specific, and product enabled, such as on-line help on the
LMT or EMS).
This hardware installation manual does not include card and module placement, applying power,
tuning, network configuration, software site commissioning, troubleshooting, etcetera.
7-2
PRELIMINARY - UNDER DEVELOPMENT
section of this chapter.
Chapter 7: What's Next and Cleanup
Site Cleanup