Install Cross Over Tubes - Simplicity 2137 Operator's Manual

60” hydraulic angling dozer blade
Table of Contents

Advertisement

A
B
Figure 19. Install Quick Connectors
A. Male Connector
B
Figure 20. Cross-Over Tubes
A. Tube w/ Beaded End
Install Cross-Over Tubes
1. Locate the metal cross-over tube with a male thread-
ed fitting on one end and a female hex fitting on the
other. Install one female quick connector (B, Figure
19) on the male threaded fitting.
2. Locate the metal cross-over tube with a male thread-
ed fitting on one end and a bead on the other. Install
one male quick connector (A, Figure 19) on the
threaded end.
3. Install the cross-over tubes (A, B, Figure 20) under
the tractor. Route the tubes through the frame as
shown in Figures 20 and 22. The tube with the
beaded end (A, Figure 20) goes in back, the tube
with the hex fitting (B) goes in front.
4. Secure the tubes according to the following steps.
Models with Kohler Air Cooled Engines:
a. Remove the two taptite screws (C, Figure 22)
located in the rear holes (see Figure 21) and
replace with two 5/16-18 x 1" taptite screws.
b. Secure the hoses using a large washer (D, Figure
22), lock washer (E), and clamp (B) as shown.
B. Female Connector
A
B. Tube w/ Threaded End
Initial Assembly & Installation
Viewed From Below
Figure 21. Mounting Hole Location
A
Figure 22. Secure Cross-Over Tubes
A. Cross-Over Tube
B. Clamp
C. Taptite Screw, 5/16-18x1 F. 5/16 Nut
Models with Kawasaki Liquid Cooled Engines:
a. Secure the cross-over tubes to the bottom of the
tractor using two 5/16-18 x 1" taptite screws (C,
Figure 22), large washers (D), lock washers (E),
and clamps (B) using the rear set of holes shown in
Figure 21.
15
Use Back Set
of Holes
B
C
B
C
Clamp Assembly
D
A
B
D. Large Washer
E. Lock Washer
E
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

1692925

Table of Contents