INSTALLATION AND WIRING

Installation

IMPORTANT
1.
Read these instructions carefully. Failure to follow
the intructions could damage the product or cause a
hazardous condition.
2.
Before installing or replacing any control check that
the test time is correct for the application. Never use
a type with a smaller test time than the calculated
test time for the application.
3.
Check the ratings given in the instructions and on
the product to make sure the product is suitable for
your application.
4.
.
The installation has to be carried out by qualified
personel only.
5.
.
Carry out a thorough checkout when installation is
completed.

Mounting Wiring Subbase

NOTE:
For installation dimensions, see Fig. 7.
1. The subbase can be mounted in any position. Make
sure that the LEDs indicating the test sequence and
faults--causes are clearly visible.
2. Select a location within an electrical panel. Be sure to
allow adequate clearance for servicing, installation and
electrical field connections.
3. For surface mounting, use the back of the subbase as a
template to mark the two screw locations. Drill the pilot
holes.
4. Securely mount the subbase using two M3.5 x 0.6
screws.

Wiring

CAUTION
1.
Disconnect power supply before beginning the
installation to prevent electrical shock, equipment
and control damage. More than one power supply
disconnect may be involved.
2.
Wiring connections are for the A4021A are
unique, therefore, refer to Table 3. and Fig. 7. for
proper subbase wiring.
3.
The A4021A must be installed with fixed wiring for
phase and neutral connections.
4.
Wiring must comply with all applicable codes,
ordiances and regualtions.
5.
After moving the A4021A valve proving system
from outdoor to indoor conditions, condensation
may occur. Do not connect condensated valve
proving system to mains.
6.
The A4021A is not suitable for phase--phase
mains., can only be used with phase -- neutral
mains.
7.
For each application diagram, local approval may
be needed

General considerations

There are two basic wiring diagrams:
• valve proving before burner start--up: pre--configuration.
• valve proving at end of heat demand: post--configuration.
Wiring
1. For proper subbase wiring, refer to Table 3.
2. Disconnect the power supply from the main disconnect
before beginning the installation to prevent electrical
shock and equipment damage. More than one
disconnect may be involved.
3. All wiring must comply with all applicable electrical
codes, ordnances and regulations.
4. Use the COM and NO contacts on both pressure
switches (LGPS and GPS).
5. Make sure loads do not exceed the terminal ratings.
refer to the label on the valve proving system, or to the
ratings in the Specifications, see Table 3.
6. Check the power supply circuit. the voltage and
frequency tolerance must match those of the valve
proving system. Add the required disconnect means
and overload protection.
7. Check all wiring circuits before installing the valve
proving system on the subbase
8. Install all electrical connectors.
9. Restore power to the panel.

Pressure switch

The pressure switch can be a normal normally open gas
pressure switch which is suitable for the appropriate pressure
levels and a voltage of 220 ... 240 Vac. Refer to the enclosed
instructions of the pressure switch. The switching point of the
GPS must be at 50 % of the nominal line--pressure.
Recommended gas pressure switch: C6058A