Lenovo ThinkSystem DM3000 series Hardware Installation And Maintenance Manual page 99

Table of Contents

Advertisement

*> ucadmin show
Current Current Pending
Adapter Mode
------- ------- --------- ------- ------- ------
0e
fc
0f
fc
0g
cna
0h
cna
...
Step 16. In Maintenance mode, destroy each original controller's mailboxes: mailbox destroy local
The console displays a message similar to the following:
Destroying mailboxes forces a node to create new empty mailboxes, which
clears any takeover state, removes all knowledge of out-of-date plexes and
mirrored volumes, and will prevent management services from going online in
2-node cluster HA configurations.
Are you sure you want to destroy the local mailboxes?
Step 17. Confirm that you want to destroy the mailboxes: y
The system displays a message similar to the following:
.............Mailboxes destroyed
Takeover On Reboot option will be set to ON after the node boots.
This option is ON by default except on setups that have iSCSI or FCP license.
Use "storage failover modify -node <nodename> -onreboot false" to turn it OFF.
*>
Step 18. Exit Maintenance mode: halt
Step 19. Turn off the power to the original controllers, and then unplug them from the power source.
Step 20. Label and remove all cables from the original controllers.
Step 21. Remove the chassis containing the original controllers.
Installing the new controllers
When you upgrade by moving storage, you begin by installing the new controllers and attaching power,
console, and network connections to the new controllers.
Step 1.
If needed, install any adapters in the new controllers, following the instructions in the appropriate
adapter installation guide.
Step 2.
Install the new controllers, following the Installation and Setup Instructions for the platform. Do not
attach disk selves from the original controllers to the new controllers at this point.
Step 3.
Attach power and console connections to the new controllers, following the Installation and Setup
Instructions for the platform.
Step 4.
Attach the network cables.
Step 5.
Transfer all remaining cables from the original controller to the corresponding ports on the new
controller. This includes Fibre Channel or other external disk shelf cables, and Ethernet cables.
Setting up the new controllers
During the process of upgrading by moving storage, you power on the new controllers, boot the software
image, and configure the new controllers.
Step 1.
Turn on the power to the first new controller, and then immediately press Ctrl-C at the console
terminal to access the boot environment prompt (also called the LOADER prompt).If you are
upgrading to a system with both controllers in the same chassis, the other controller also reboots.
You can disregard booting the other controller for now.
Step 2.
If the new controller has a single-chassis configuration (with controllers in the same chassis):
a.
Switch the console cable from the current new controller to the other new controller.
Pending
Type
Mode
Type
initiator -
-
online
initiator -
-
online
target
-
-
target
-
-
Status
online
online
Chapter 6
.
Upgrading controller hardware
93

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem dm5000 series

Table of Contents