Source voltage operation
To set up the U2722A/U2723A for source voltage operation, proceed as follows.
Keysight Measurement Manager operation
1 Connect a load to the output terminals.
2 Turn on the U2722A/U2723A.
Figure 2-2
36
Turn off the U2722A/U2723A power. Connect a load to the OUTPUT+ and
OUTPUT– terminals of an output channel.
The U2722A/U2723A will go into a power-on or reset state; the output is
disabled. Ensure that the USB interface has already been connected between
the U2722A/U2723A and PC. Run the Keysight Measurement Manager
software to control the U2722A/U2723A remotely.
On the application panel as shown in
have connected. Select the required voltage and current ranges. Otherwise,
enable Auto Range for both voltage and current. Proceed to select Source
Voltage.
Panel view of the Keysight Measurement Manager
Figure
2-2, select the channel that you