Table 1-2 provides a checklist to be used when preparing the electronics
room for the FSC Safety Manager cabinets.
Table 1-2 – Move preparation checklist – part 2
Check
Action
Static Electricity
1
2
Tack Rugs
Fire Prevention
3
4
Room Layout
Cabinet
5
Bolt-Down
FSC Safety Manager Installation Guide
Reduce the ESD-borne failures by:
• stripping the floors of any wax to prevent
static charge buildup,
• using anti-static spray on floors, furniture and
fabric in the work area, and
• placing a sign on or near the equipment that
states circuit boards are not to be handled
without wearing a ground strap.
Placed at all entrances, tack rugs catch dust, grit
and abrasives from other areas.
Consult with the local fire prevention authority to
select fire extinguishers suitable for electrical
fires.
Prepare an electronics room layout diagram for
cabinet placement.
• Refer to Figure 1-1.
If this FSC Safety Manager cabinet is to be
bolted down, pre-drill holes in the floor.
ATTENTION
Refer to Figure 1-2 for
placement and dimensions of the bolt-down
holes.
Notes
Continued on next page