GE Druck DPI612 series Safety And Quick Start Manual page 17

Portable pressure calibrator. measurement and control
Hide thumbs Also See for Druck DPI612 series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Safety and Quick Start Guide
When using the DPI612 - HFP for the first time, fill the reservoir with the
correct hydraulic fluid (Fluid type: Demineralised water or a mineral oil
(Recommended ISO viscosity grade ≤ 22)). Fill and prime the pressure station.
If new, remove the red plastic blanking cover from the Test port.
Fill the reservoir using the procedure that follows:
Filling and Priming the pump
1
6
11
Step
Procedure
1.
Turn the Refill valve fully counter-clockwise (Ref: Item 11).
2.
Turn the Volume adjuster fully clockwise (Ref: Item 2.1).
3.
Turn the Release Valve Stem fully counter-clockwise (Ref: Item 5).
4.
Remove the Priming pump piston/Release valve stem assembly.
Page 17 of 20
2
7
12
Remove Priming
Pump
3
8
13
[EN] English – 109M0089
Druck DPI612
4
x5
9
10
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Druck dpi612- pfxDruck dpi612- hfpDruck dpi612- pfp

Table of Contents