Handling - Riello RESIDENCE COLONNA CONDENS SOLAR KV/200 - 30 ISC Installation And Maintenance Manual

Table of Contents

Advertisement

2 .3 Handling

Once you have removed the packaging, proceed as fol-
lows to handle and move the boiler.
− Unscrew the 4 screws (A) shown in the figure and
remove the boiler from the pallet.
− Remove the front panel (1) to facilitate handling
and movement of the boiler.
− Grip the boiler at points (B) and tilt it backwards,
then grip it at points (B) and (C) to lift it. An op-
tional handling bracket kit is available to provide
a better grip at points (B).
9
Do not lift the boiler by its casing but only by rigid
parts such as its base and top frame .
9
Wear suitable personal protective equipment and
use suitable safety devices .
0
Do not dispose of packaging material into the en-
vironment, or leave it within the reach of children,
since it can become a potential hazard. Dispose of
packaging material in compliance with applicable
legislation .
A
OPEN
1
LIFT
C
C
21
INSTALLER
A
TILT
B
B

Advertisement

Table of Contents
loading

Table of Contents