Download  Print this page

Sharp EL-6053 Operation Manual

Electronic organizer
Hide thumbs
   

Advertisement

NOTICE
• SHARP strongly recommends that separate
permanent written records be kept of all
important data. Data may be lost or altered in
virtually any electronic memory product under
certain circumstances. Therefore, SHARP
assumes no responsibility for data lost or
otherwise rendered unusable whether as a
result of improper use, repairs, defects, battery
replacement, use after the specified battery life
has expired, or any other cause.
In Europe:
This equipment complies with the requirements of
Directive 89/336/EEC as amended by 93/68/EEC.
Dieses Gerät entspricht den Anforderungen der EG-
Richtlinie 89/336/EWG mit Änderung 93/68/EWG.
Ce matériel répond aux exigences contenues dans la
directive 89/336/CEE modifiée par la directive 93/68/
CEE.
Dit apparaat voldoet aan de eisen van de richtlijn 89/336/
EEG, gewijzigd door 93/68/EEG.
Dette udstyr overholder kravene i direktiv nr. 89/336/EEC
med tillæg nr. 93/68/EEC.
Quest' apparecchio è conforme ai requisiti della direttiva
89/336/EEC come emendata dalla direttiva 93/68/EEC.
Notes
• While operations are described mainly for EL-
6053, unless otherwise specified, the text
materials apply to both models. In case of need,
the operations are described as "For EL-6810
only:".
EL-6053
t
q Power ON/OFF key
w Cursor keys
e Search keys
r RESET switch
t Mode keys
The following notations are used for
key operations.
: Clear memory
CM
(in Calculator mode)
: Letter "U"
U
: Turn the touch
SHIFT
tone on and off
: Letter "V"
V

Using the Organizer for the First Time

Be sure to perform the following operations
before using the Organizer for the first time.
1. Remove the isolating film that is affixed to the
battery holder on the back of the unit.
2. Press the RESET switch with a ball-point pen
or similar object.
"RESET?" is displayed.
3. Press
to initialize the
SHIFT ENTER
Organizer.
After "RESET!" is displayed, Home clock is
displayed. (See "Clock Mode".) You have
deleted all the memory contents now.
Changing the Guidance Language
Guidance messages can be displayed in 7
languages – English, Dutch, Portuguese, Italian,
German, French, and Spanish. After initializing the
Organizer, the default setting is English.

Entering Characters

• Alphanumeric letters, symbols, and "+ –
can be entered into the dot display area (the 1st
line).
• Numbers and some characters (only space, –,
and F and P in Telephone mode) can be entered
into the number display area (the 2nd and the
3rd lines).
• Basically letters are entered in capital letters
("CAPS" is turned on). To enter small letters,
press
to turn "CAPS" off.
CAPS
Entering symbols and letters with an accent
mark
• To enter a symbol, press
repeatedly until
SMBL
the desired symbol appears:
( )~': / \_&<>ß!? ¡¿
@#$£¥
• To enter a letter with an accent mark, press
to turn "SHIFT LOCK" on, and
SHIFT
SHIFT
press the appropriate key repeatedly. (Refer to
the "QUICK REFERENCE GUIDE" inside the
cover.)
• To turn "SHIFT LOCK" off, press
SHIFT
Home clock
Home city (with "
")
Day of the week
LON
MON
Date
2001– 1– 1
Time
A12–00–00
Each time you press
, the clock switches
CLOCK
between Home and World clocks. (For World
clock, "
" is not displayed.)
1. Before setting the clock
• The default setting for the date is "YYYY/MM/
DD" (year-month-day). To change the setting to
"MM/DD/YYYY" (month-day-year) or "DD/MM/
YYYY" (day-month-year):
1. Press
once or twice to display
CLOCK
Home clock (with "
").
2. Press
.
SHIFT DATE TYPE
NEXT
3. Press
or
to select the desired
PREV
type.
4. Press
to store the new setting.
ENTER
• To change the 12-hour clock to the 24-hour
clock, press
("A" or "P" is cleared).
12
24
Each time you press
, the clock
12
24
switches.
• In the period of daylight saving time/summer
time, press
in advance ("#" is displayed).
DST
2. Setting the clock
1. Press
once or twice to display Home
CLOCK
clock (with "
").
2. Press
to start setting.
SHIFT SET
The cursor starts to flash on the city name.
ELECTRONIC ORGANIZER
EL-6053
EL-6810
OPERATION MANUAL
• SHARP assumes no responsibility, directly or
indirectly, for financial losses or claims from
third persons resulting from the use of this
product and any of its functions, such as stolen
credit card numbers, loss or alteration of stored
data, etc.
• The information provided in this manual is
subject to change without notice.
Η εγκατάσταση αυτή ανταποκρίνεται στισ απαιτήσεισ
των οδηγιών τησ Ευρωπαïκήσ Ενωσησ 89/336/ΕΟΚ,
πωσ ο κανονισµ σ αυτ σ συµπληρώθηκε απ την
οδηγία 93/68/ΕΟΚ.
Este equipamento obedece às exigências da directiva 89/
336/CEE na sua versão corrigida pela directiva 93/68/
CEE.
Este aparato satisface las exigencias de la Directiva 89/
336/CEE modificada por medio de la 93/68/CEE.
Denna utrustning uppfyller kraven enligt riktlinjen 89/336/
EEC så som kompletteras av 93/68/EEC.
Dette produktet oppfyller betingelsene i direktivet 89/336/
EEC i endringen 93/68/EEC.
Tämä laite täyttää direktiivin 89/336/EEC vaatimukset,
jota on muutettu direktiivillä 93/68/EEC.
• One of the models described in this manual
may not be available in some countries.

Part Names

EL-6810
q
w
e
t
r
• Yellow colored functions are operated by
pressing
("SHIFT" is turned on) and the
SHIFT
appropriate keys.
• In this manual, only the display symbols
necessary for explanation of this product are
shown.
NOTES
• If the Organizer is subjected to strong,
extraneous electrical noises or shocks during
use, an abnormal condition may occur in which
OFF
no keys (including
) will respond. Press
ON
the RESET switch and press
SHIFT ENTER
delete all the memory contents.
• To minimize battery consumption, the Organizer
is designed to automatically turn off when no
key has been pressed for approximately 7
minutes.
• The key touch tone is turned on and off by
pressing
. When the tone is turned
SHIFT
on, " " is turned on.
To change the language, press
NEXT
followed by
or
to select the desired
PREV
language, then press
.
ENTER
÷ ."
Making corrections
Move the cursor to the character to be corrected.
Enter the correct character to replace the previous
one.
Cursor
The cursor (_) indicates the position for entering a
character. Move the cursor with the cursor keys
(
).
Inserting characters
Each time
is pressed, a space is inserted at
INS
the cursor position to allow you to enter a
character.
Deleting characters
Press
to delete the character at the cursor
DEL
position.
Press
to clear all the characters that you
C•CE
have entered and not stored yet.
For EL-6810 only: Press
to delete the
BS
character at the left of the cursor.
again.

Clock Mode

NEXT
3. Press
or
to select the desired
PREV
time zone. (Refer to the list of cities described
below.)
• Enter the city name, if needed (6 characters
or under). Only one changed name for Home
clock can be stored.
4. Press
to move the cursor to the year.
5. Enter the year (4 digits), the month, and the
day (2 digits each).
• The built-in calendar extends from January
1st, 1901, to December 31st, 2098.
6. Press
to select "A" (morning) or "P"
AM•PM
(afternoon) for the 12-hour clock.
7. Enter the time (hours and minutes).
Note: P12-00: noon, A12-00: midnight
8. Press
. The clock starts from "00"
ENTER
seconds.
Notes
• To enter a single-digit date or time, enter "0"
and the digit (e.g. "02").
• If you enter an invalid date or time, "ERROR!"
appears briefly. Enter the correct date and time
and press
.
ENTER
Zone Display
City
Zone Display
No.
No.
0
TNG
TONGA
10
MOW MOSCOW
1
WLG WELLINGTON
11
CAI
2
NOU NOUMEA
12
PAR
3
SYD
SYDNEY
13
LON
3.3
ADL
ADELAIDE
14
AZ0
4
TYO
TOKYO
15
-2H
5
HKG
HONG KONG
16
RIO
6
BKK
BANGKOK
17
CCS
6.3
RGN YANGON
18
NYC
7
DAC
DHAKA
19
CHI
7.3
DEL
NEW DELHI
20
DEN
8
KHI
KARACHI
21
LAX
8.3
KBL
KABUL
22
ANC
9
DXB
DUBAI
23
HNL
9.3
THR
TEHRAN
24
MID
3. Using World clock
1. Press
CLOCK
clock (without "
2. Press
PREV
city.
4. Changing the cities between Home
and World clocks
You can change the home city for a city in another
time zone without adjusting the stored correct
time.
1. Press
CLOCK
clock (without "
2. Press
PREV
city to be set as the new home city.
3. Press
SHIFT SET
between Home and World clocks.
• The previous home city is now set as the
world city (without "
4. Press
CLOCK
• The selected city in step 2 is set as the home
city (with "
5. Press
CLOCK
press
PREV
city, if needed.
5. Setting daylight saving time (DST:
summer time)
1. Press
CLOCK
or World clock.
2. Press
.
DST
"#" is displayed. The time is set 1 hour ahead.
To clear DST, press
is set 1 hour behind.
Notes
• DST can be set independently in either Home or
World clock.
• When DST is set for one world city, it is used
for all cities displayed in World clock.
Telephone mode is composed of two files, TEL1
("1" is turned on) and TEL2 ("2" is turned on).
Use these files for convenience, e.g. business
and private files.
A telephone entry consists of name, address,
q
E-mail address, and number fields.
w
For EL-6810 only:
e
• Moreover, EL-6810 has the web address (URL)
field that follows the E-mail address field.
r
• Instead of pressing
following operations, press
Storing telephone entries
1. Press
once or
TEL
twice to display the

Telephone mode

screen (in this case,
TEL1).
2. Enter the name, e.g. SMITH
and press
ENTER
3. Enter the address, e.g. 18
ROAD, and press
SPACE
4. Enter the E-mail
address, e.g.
SROB
SMBL
(to enter " @ ")
SHARPSEC.COM, and press
• The E-mail address is automatically entered
in small letters.
For EL-6810 only:
• To enter " @ ", simply press
.
SMBL
• After entering the E-mail address and
pressing
ENTER
(URL), e.g. WWW.SHARP-USA.COM, and
to
press
ENTER
Schedule mode is used for storing schedule
details (36 characters or under), date and time
(year, month, day, hour, and minute).
In the 1st line the same characters are allowable
as in Telephone mode.
1. Storing schedule entries
1. Press
SCHEDULE
SHIFT LANGUAGE
display the Schedule
mode screen.
2. Enter the details and
press
ENTER
3. Enter the date and time.
• The types of date and time are the same as
the types set for the clock.
• To enter a single-digit date or time, enter "0"
and the digit (e.g. "O2").
Notes or other pieces of information that are not
appropriate for Telephone or Schedule mode can
be entered for convenience.
In the 1st line the same characters are allowable
as in Telephone mode. In the 2nd and the 3rd
lines you can enter numbers, –, and space. (36
characters or under can be entered in each line.)
Storing memo entries
1. Press
MEMO
display the Memo
mode screen.
• When the memory is full, "MEMORY FULL!"
appears briefly, and the entry cannot be stored.
• When the symbol " " or " " is turned on,
more information exists. Press
switch the display.
Checking details of entries in Telephone mode
• To display each field on the 1st line, follow the
symbol " " or " " and press
symbol above the 1st line shows each field.)
Recalling entries – Telephone, Schedule, Memo –
First press the desired mode key.
NEXT
: Recalls entries in forward order
: Recalls entries in reverse order
PREV
Sequential search
NEXT
Press
or
Direct search
• Enter the first characters (7 characters or
under) of the person's name, schedule details,
or memo item, and press
NEXT
Then press
performing a direct search.
City
CAIRO
PARIS
LONDON
AZORES ISLANDS
2hrs behind LON
RIO DE JANEIRO
CARACAS
NEW YORK
CHICAGO
DENVER
LOS ANGELES
ANCHORAGE
HONOLULU
MIDWAY
6. Setting alarms
once or twice to display World
The Organizer has 3 kinds of alarm:
").
1. Daily alarm ........ beeps every day at the alarm
NEXT
or
to select the desired
2. Hourly alarm ...... beeps every hour when
3. Schedule alarm .. beeps at the time for all the
once or twice to display World
").
Press any key to stop the alarm beeping.
NEXT
or
and select the desired
Setting/Changing the daily alarm time
1. Press
to change the cities
clock (with "
2. Press
display the daily
").
alarm screen.
to check the home city.
(The display differs
between the 12-hour and 24-hour clock.)
").
3. Press
to recheck the world city, and
4. Enter the time.
NEXT
or
to select the new world
5. Press
• The daily alarm time is set.
Turning the alarms on and off
An alarm sounds only when the respective symbol
(
,
once or twice to display Home
Display Home clock (press
and press
screen.
Each time you press
to clear "#". The time
DST
screen is displayed, the combination of symbols
switches.
Note
• Alarms sound even when the Organizer is
turned off.
Telephone Mode
5. Enter the phone
number, and then
the fax number if
needed, e.g.
012-3456-7890
F
SPACE
press
• "STORED!" appears briefly, then the Telephone
mode screen is displayed. The telephone entry
is now stored.
once or twice in the
TEL
or
once.
TEL1
TEL2
The 1st line:
Name, address,
E-mail address
NAME?
(and web address
(URL) for EL-6810
only)
The 2nd and the
3rd lines:
Phone number
ROBERT,
SPACE
.
Notes
EAST
SPACE
• The symbol "NAME", "ADDRESS", or "E-mail"
.
ENTER
(or "URL" for EL-6810 only) is turned on while
sec.com _
entering in each field.
har
p
• To skip entry of an address, E-mail address,
(web address (URL),) or number, press
when "ADDRESS?", "E-MAIL?", ("URL?",) or
.
ENTER
"NUMBER?" is displayed. However, entering a
person's name cannot be skipped.
instead of
@
, enter the web address
.

Schedule Mode

4. Press
Notes
• Schedules for the following dates can be stored:
January 1901 to December 2098.
• If an attempt is made to store an entry without a
date or time, or with an invalid date or time,
"ERROR!" appears briefly. Enter the correct
date and time and press
to
SCHEDULE?
2. Alarm for Schedule mode
When the schedule alarm ("
.
is set for all the schedule entries. Beeping sounds
for 1 minute when the time for a schedule entry is
reached. Press any key to stop the alarm. The
schedule alarm cannot be set for an individual
entry.

Memo Mode

2. Enter the memo item
and numbers.
E.g. UNION
3. Press
to
MEMO?

Notes for storing and recalling entries

• Pressing
on the 1st line directly.
For EL-6810 only: Pressing
or
to
again displays the web address (URL) on the
1st line. Each time you press
the display switches between the E-mail and the
web addresses.
• Press and hold
or
. (The
1st line. Press
scroll. Press
Sorting order
• Telephone and memo entries are stored by the
first character of the person's name or memo
item in the following order (case sensitive):
in each mode.
PREV
• Schedule entries are stored by date and time.
Note
NEXT
or
.
PREV
• When there is no (further or relevant) entry to
or
to continue
PREV
be recalled, "NOT FOUND!" appears briefly, and
the display returns to the mode screen.
PRINTED IN CHINA/IMPRIMÉ EN CHINE
time (for 1 minute), when
"
" is turned on.
minutes reach "00", when
"
" is turned on.
schedule entries (for 1
minute), when "
" is
turned on. (Refer to
"Schedule Mode".)
once or twice to display Home
CLOCK
").
to
ALARM
ALARM
A12–00
.
SHIFT SET
.
ENTER
, or
) is turned on.
once or twice)
CLOCK
to display the daily alarm
ALARM
while the daily alarm
ALARM
NUMBER?
2–3456–7890
3456–7891 _
3456-7891, and
SPACE
SPACE
.
ENTER
Number of
Allowable
Field
characters
characters
36 characters
Alphabetic letters,
or under
numbers, symbols,
"+ – ÷ .", space
Numbers, space, –,
F (Fax), P (Pager)
ENTER
to store in the memory.
ENTER
.
ENTER
") is turned on, it
UNION BANK
01
SPACE
272–0011223 _
BANK
ENTER
01
272-0011223
to store in the memory.
ENTER
displays the E-mail address
E-MAIL
(
)
E-MAIL
WWW
(
E-MAIL
WWW
to start the auto scroll on the
again to stop or restart the
to quit the auto scroll.
C•CE
00BTO (TINSE0355EHZZ)
),

Advertisement

Table of Contents
loading

  Related Manuals for Sharp EL-6053

  Summary of Contents for Sharp EL-6053

  • Page 1: Telephone Mode

    EL-6053 EL-6810 NOTICE • SHARP strongly recommends that separate • SHARP assumes no responsibility, directly or permanent written records be kept of all indirectly, for financial losses or claims from important data. Data may be lost or altered in third persons resulting from the use of this...
  • Page 2: Secret Function

    • Since this product is not waterproof, do not use it or store it where fluids can splash onto it. • Clean only with a soft, dry cloth. • Use only a SHARP approved service facility. Replacing Battery For EL-6053 only: 1.

This manual is also suitable for:

El-6810