Section 3: Installation; Machine Package Receipt/Inspection; Installation Instructions - Vanair Viper Series Operator's Manual & Parts List

Rotary screw air compressor
Table of Contents

Advertisement

VIPER DIESEL
3.1 MACHINE PACKAGE
RECEIPT/INSPECTION
Upon receipt of the machine package,
inspect the exterior of the shipping crate for
signs
of
shipping/transit
damage should be reported immediately to
the shipping company. Open the lid and
inspect the component parts and supports to
ensure that there has been no internal
movements of assemblies or components
which may have caused damage. To install
the Viper Diesel Compressor System, refer
to the following sections.
Contact Vanair
(219) 879-5100 / (800) 526-8817
Service Fax: (219) 879-5335
www.vanair.com
to report missing items, incorrect part
numbers, or other discrepancies.

3.2 INSTALLATION INSTRUCTIONS

DO NOT install in enclosed spaces.
ELECTRICAL HAZARD! Be sure the
battery is disconnected before starting
the installation.
In order to prevent accidental damage to
vehicle components (fuel tanks, lines,
brake lines, wiring harnesses), note their
location before drilling any holes.
VANAIR MANUFACTURING, INC.
(800) 526-8817 • www.vanair.com
SECTION 3:
INSTALLATION
damage.
NOTE
®
at
DANGER
WARNING
NOTE
090058-OP_r0 (AUGUST-2014)
Refer to Figure 3-1 (parts 1 and 2), and the
following procedure:
1. Position the machine so that there is no
restriction of cooling air through the
enclosure (minimum of 12 inches from
Any
front access side; minimum of six
inches from rear side. Cooling air
enters the enclosure through the front
and rear panels, passes through the
cooler, and exits through vents in the
end shroud.
2. Ensure that adequate height and
clearance exists to allow for the hood to
open (minimum of 49.9 inches from
mounting surface), and a clear passage
for service allowance to the
maintenance access panel located at
the back.
3. Mounting surface or support should be
adequate for the weight of the machine
and should be level for normal operation.
Mounting holes for four (4) 1/2" hold
down bolts are provided. Refer to
Section 7, Illustrations and Parts Lists
for additional installation and system
schematic drawings.
4. Service connections are conveniently
grouped at the end of the unit in the
base frame.
5. Electrical connections (system
designed for 12VDC negative ground).
Ensure all supply hoses and electrical wiring
are correctly specified, adequately supported
and do not touch or rest on any sharp edges.
Wiring should be protected with split loom to
prevent corrosion and consequently, loose
due to down time.

SECTION 3: INSTALLATION

PAGE - 7