Pre-Operation Checklist - Baldor 22H series Installation & Operating Manual

Line regen ac flux vector control vector drive
Table of Contents

Advertisement

Section 1
General Information
PC865
50mA max

Pre-Operation Checklist

MN722
Figure 3-27 Opto-Output Equivalent Circuit
PC865
PC865
50mA max
50mA max
50mA max
Terminal Tightening Torque = 7 Lb-in (0.8 Nm).
Check of Electrical Items
CAUTION: After completing the installation but before you apply power, be
sure to check the following items.
1.
Verify AC line voltage at source matches control rating.
2.
Inspect all power connections for accuracy, workmanship and tightness and
compliance to codes.
3.
Verify control and motor are grounded to each other and the control is
connected to earth ground.
4.
Check all signal wiring for accuracy.
5.
Be certain all brake coils, contactors and relay coils have noise suppression.
This should be an R-C filter for AC coils and reverse polarity diodes for DC
coils. MOV type transient suppression is not adequate.
WARNING: Make sure that unexpected operation of the motor shaft during start
up will not cause injury to personnel or damage to equipment.
Check of Motors and Couplings
1.
Verify freedom of motion for all motor shafts and that all motor couplings are
tight without backlash.
2.
Verify the holding brakes if any, are properly adjusted to fully release and set to
the desired torque value.
J1
18
Opto Output 1
19
Opto Output 2
20
Opto Output 3
21
Opto Output 4
22
PC865
Opto Out 1 Return
41
Opto Out 2 Return
42
Opto Out 3 Return
43
Opto Out 4 Return
44
10 – 30VDC
Opto Outputs
Receiving & Installation 3-47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents