Commissioning The Device - Siemens SIMATIC HMI series Operating Instructions Manual

Industrial flat panels
Hide thumbs Also See for SIMATIC HMI series:
Table of Contents

Advertisement

Commissioning the device

If you operate the device exclusively as monitor and do not change the brightness, you do
not need to commission the device. To use advanced functions of the device, perform the
following commissioning.
Requirement
● The Industrial Flat Panel is mounted according to the Quick Install Guide.
● The Industrial Flat Panel is connected according to the Quick Install Guide and connected
to a PC for commissioning.
Note
The supplied connecting cables are only intended for commissioning and not for
continuous operation.
Use suitable connecting cables for interrupted duty, see section "Accessories (Page 27)".
● DVD "Documentation and Drivers" or USB stick with a copy of the DVD
Procedure
1. Switch on the PC.
2. Switch on the power supply of the Industrial Flat Panel.
3. Insert the "Documentation and Drivers" DVD into the CD/DVD drive of the PC.
Alternative: Insert the USB stick with the copy of the DVD into a USB port on the PC.
4. Follow the instructions for installation.
IFP, IFP PRO, IFP ETH
Operating Instructions, 11/2017, A5E31298376-AH
4
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic ifp2200Simatic ifp1500Simatic ifp1900Simatic ifp1900 ethSimatic ifp1900 proSimatic ifp2200 eth ... Show all

Table of Contents