Siemens SINAMICS G120P CU230P-2 Compact Operating Instructions page 8

Hide thumbs Also See for SINAMICS G120P CU230P-2:
Table of Contents

Advertisement

Installing
3.1 Plugging the Control Unit onto the Power Module
Special features for the PM230 Power Module IP55, FSA ... FSC
To insert or detach the Control Unit, you must
release eight or ten fixing screws of the cover
and then remove the cover.
The Power Module release mechanism is
shown in the diagram.
Attach the cover again before you commission
the inverter. Do not damage the seal of the
cover when attaching it.
Installing the Control Unit, PM230 IP55 - FSD ... FSF
To insert or detach the Control Unit, you must
open the front door of the Power Module.
Close the door before you commission the in-
verter. Check to ensure that the seals are not
damaged.
Plugging on an operator panel
Procedure
To plug an Operator Panel on the Control Unit, proceed as follows:
1. Locate the lower edge of the Operator Panel into the matching recess
of the Control Unit.
2. Plug the Operator Panel onto the inverter until the latch audibly
engages.
You have plugged an operator panel onto the Control Unit.
The operator panel is ready for operation when you connect the inverter to the power supply.
8
Compact Operating Instructions, 01/2017, A5E38815802B AA
CU230P-2 Control Units

Advertisement

Table of Contents
loading

Table of Contents