Cisco 3110 Message Manual page 83

Catalyst switch module for ibm bladecenter system
Hide thumbs Also See for 3110:
Table of Contents

Advertisement

Chapter 2
Message and Recovery Procedures
Error Message PM-4-ERR_RECOVER: Attempting to recover from [chars] err-disable state
on [chars].
Explanation
error-disabled state. The first [chars] is the error, and the second [chars] is the affected interface.
Recommended Action
Research and attempt to resolve the error by using the Output Interpreter. Enter the show
tech-support user EXEC command to gather data that might help identify the nature of the error.
Use the Bug Toolkit to look for similar reported problems. If you still require assistance, contact
IBM technical support and provide the representative with the gathered information. For more
information about the online tools and about contacting IBM, see the
Reports" section on page
Error Message PM-4-ERR_RECOVER_VP: Attempting to recover from [chars] err-disable
state on [chars], vlan [dec].
Explanation
error-disabled state. The first [chars] is the error, the second [chars] is the virtual port, and [dec] is
the VLAN ID.
Recommended Action
Research and attempt to resolve the error using the Output Interpreter. Use the Bug Toolkit to look
for similar reported problems. If you still require assistance, open a case with the TA C, or contact
your Cisco technical support representative, and provide the representative with the gathered
information. For more information about these online tools and about contacting Cisco, see the
Message Traceback Reports" section on page
Error Message PM-4-EXT_VLAN_INUSE: VLAN [dec] currently in use by [chars].
Explanation
being used by another feature. [dec] is the VLAN that is being used, and [chars] is the feature that
is using it.
Recommended Action
VLAN or to request another available VLAN.
Error Message PM-4-EXT_VLAN_NOTAVAIL: VLAN [dec] not available in Port Manager.
Explanation
used as an internal VLAN by other features. [dec] is the requested VLAN.
Recommended Action
OL-12191-01
The port manager is attempting to bring the interface up after taking it down to the
Copy the message exactly as it appears on the console or in the system log.
1-6.
The port manager is attempting to bring up the virtual port after taking it down to the
Copy the message exactly as it appears on the console or in the system log.
The port manager failed to allocate the VLAN for external use because the VLAN is
Reconfigure the feature (for example, the routed port) to use another internal
The port manager failed to allocate the requested VLAN. The VLAN is probably being
Try to configure a different VLAN on the device.
Cisco Catalyst Switch Module 3110 and 3012 for IBM BladeCenter System Message Guide
"Error Message Traceback
1-6.
PM Messages
"Error
2-67

Advertisement

Table of Contents
loading

This manual is also suitable for:

3112

Table of Contents