Panel Security - Honeywell IFP-2100 Installation And Operation Manual

Analog/addressable fire system emergency communication system
Hide thumbs Also See for IFP-2100:
Table of Contents

Advertisement

Panel installation / maintenance security checklist
System Description: ________________________________________________________________
System Location: __________________________________________________________________
Installer: _________________________________________________ Date: __________________
Complete the following Cyber security tasks for each panel Install
Install the panel in a secure location considering both software and hardware vulnerabilities.
Change the default password to a unique password
Securely configure networks and firewalls
Assess security risks
Develop a Disaster and Recovery Plan
Develop a Backup and Recovery Strategy
Install, configure and keep anti virus software updated on all computers which access the panel
Keep operating system updated on all computers which access the panel
Deliver all required system information upon delivery to the system owner
Train end-users on security maintenance tasks upon system delivery
For decommissioning, dispose of data securely.
Ensure the Ethernet cable is removed from the FACP when not being utilized for configuration or for
reporting purposes.
Security and Data Protection
Communication Security - Level 1
Stored Data Security - Level 0
Physical Security - Level 1
Access Control Security - Level 1

Panel Security

1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ifp-2100ecsRfp-2100

Table of Contents