Telario TS3000 Control Station Installation Manual
November, 1999
An Unclassified or Zone 3 county is one that qualifies for Zone 1 status. How-
ever, due to a business population being less than 5,000, it has not been sched-
uled for conversion at this time. Most Unclassified counties will be
automatically converted to Zone 1 Status by UTAM when a member initiates
a site specific coordination request, with conversion costs to be paid by UTAM.
Overall Process
6880906Z38-O
Dealer contacts
Motorola Product Srvcs
to conduct site specific
interference analysis &
frequency coordination.
-3