5. Close the DIMM access door.
6. If you have other options to install or remove, do so now.
7. Close the server cover. See "Completing the installation".

Completing the installation

Complete the following steps to complete the installation:
1. Close the top cover.
2. Install the server in the rack cabinet. See the Rack Installation Instructions that
3. Connect the cables and power cords. See "Connecting the cables" for more

Connecting the cables

The following illustration shows the locations of the input and output connectors on
your server.
Notes:
1. You must turn off the server before connecting cables to or disconnecting any
2. See the documentation that comes with your external devices for additional
3. Cable identifiers are printed on the cables that come with your server and
retaining clips, remove the DIMM, and then reinsert it.
DIMM slot 1
come with your server for detailed information about how to install the server in
a rack cabinet.
Attention:
v Install your server only in a rack cabinet with perforated doors.
v Do not leave open space above or below an installed server in your rack
cabinet. To help prevent damage to server components, always install a filler
panel to cover the open space and to help ensure proper air circulation. See
the documentation that comes with your rack cabinet for more information.
information.
cables from the server.
cabling instructions. It might be easier for you to route cables before you
connect the devices to the server.
options. Use these identifiers to connect the cables to the correct connectors.
DIMM slot 15
DIMM slot 14
Chapter 2. Installing options
DIMM slot 28
21