Running Multiple Tests - Viavi T-BERD MTS 5800 Getting Started Manual

T-berd/mts/sc getting started guide
Hide thumbs Also See for T-BERD MTS 5800:
Table of Contents

Advertisement

Table 13 Multiple Test Restrictions
Assembly
Application
10 Gbps
applications
10 Gbps Packet
Capture
NextGen applica-
tions (launched
from the standard
SONET or SDH
test menu)
MSAMs in 8000
All
Dual Module
Carrier (DMC)

Running multiple tests

To run multiple tests you need to have a dual port unit:
1
Verify that your instrument is powered using the adapter that shipped with it.
2
Start the first test by doing the following:
a
b
c
d
3
To run a second test, do the following:
a
March 2018
Restriction
When running a 10 GigE Ethernet, 10 Gig Fibre Chan-
nel, OC-192, or STM-64 test, you can run one additional
test (at a lower line rate) while operating the instrument
at:
– 32°F to 95°F (0°C to +35°C)
Your battery will not charge while running multiple tests
with one application at a 10 Gbps line rate. For details,
see the section on charging your battery in the Getting
Started Manual that shipped with your instrument or
upgrade.
When running a 10 GigE LAN or WAN application, and
capturing data on Port #1, you can not run a 1 GigE
application from Port #2. If you want to run a 1 GigE
application on Port #2, you must first disable packet
capture for the 10 GigE application running on Port #1.
You can run applications for lower line rates (for exam-
ple, 10/100/10000 Mbps Ethernet) on Port #2 when
capturing packets on Port #1 for a 10 GigE application.
Additional tests can not be run when running a NextGen
application, and if you are using an MSAM, you must
use the PIM in port 1. You can not run a second test on
port 2, and you can not run NextGen tests from port 2.
Please contact your local sales office or technical assis-
tance representative for a list of restrictions when run-
ning multiple tests using this assembly.
Using the Test menu, select a test application see
application" on page
109).
Configure the test (see
Connect the module to the circuit (refer to your instrument's Getting Started
Manual).
Start the test (see
"Step 4: Starting the test" on page
Select Test > Add Test.
T-BERD/MTS/SC Getting Started Guide
22046537, Rev. 016
"Step 2: Configuring a test" on page
Chapter 4 Basic Testing
Running multiple tests
"Step 1: Selecting a test
113).
115).
Page 127

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-berd sc 4800pT-berd mts 5800-100gT-berd sc 4800

Table of Contents