Priming Sequence - GE Druck DPI612 User Manual

Portable pressure calibrator
Hide thumbs Also See for Druck DPI612:
Table of Contents

Advertisement

User Manual
2.3.4

Priming Sequence

1
5
Step
1
2
3
4
5
6
7
8
Note: If priming a long hose keep the open end of hose vertical to
reduce trapping air.
Page 49 of 105
Turn the Volume Adjuster counter-clockwise. (See Section
1.9.7)
Turn the Volume Adjuster 10 turns clockwise
Close Release Valve.
Close Refill Valve clockwise, finger tight (See Section 1.9.8).
Operate Priming Pump until liquid is seen coming from the
open test port / end of hose.
Connect IUT to open test port / end of hose.
Operate Priming Pump until pressure is indicated (max 10
bar)
Operate Volume Adjuster & Refill Valve to achieve required
pressure. (See Section 2.3.5)
2
6
Procedure
[EN] English – 109M4017 Revision -
Druck DPI612
3
4
7
8

Advertisement

Table of Contents
loading

Table of Contents