Operation; Display; Start-Up - Honeywell OELD Operating Instructions Manual

Smart junction box
Hide thumbs Also See for OELD:
Table of Contents

Advertisement

6 Operation

20
6 Operation

6.1 Display

6.1.1 Start-up

The start-up and self-test sequence of the OELD takes approximately 60 seconds. During this time the user can check that each
of the functions listed below are operating correctly as well as the OELD checking the correct operation of its critical circuits and
processes. The OELD will perform a series of functional tests, including:
• Display test – each segment of the LCD will be sequentially activated
• Backlight test – each of the colours of the backlight will be activated several times
• Internal hardware and memory checks
• Display of software version
• Display of user-configured settings such as gas name, range and alarm set points
Once the LCD and backlight tests have completed, the green backlight indication will be illuminated for the remainder of the start-up sequence.
Once the OELD has completed this start-up sequence, it will enter its normal operating condition.
<Figure 16. Start-up Sequence>
OELD Operating Instructions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents