Sharp CE-140P Service Manual page 24

Hide thumbs Also See for CE-140P:
Table of Contents

Advertisement

-21-
Carriage
RE (2.
3)
Frame L
*Top View of the Frame Ass'y
Insert the guide shaft (the side without the RE hole) from the
guide shaft hole of frame
R,
pass it throught the carriage shaft
hole,
then insert it into the guide shaft hole of the frame. At this
time, the protuberance
(section
@)
of the back section of the
carriage projects outside the
frame.
After completing the above operation.tighten the retaining ring
(RE) so that the adjusting lever is caught between the inner and
outer sides of frame
R.
x2
Carriage unit
RE(2.3)
8
Guide shaft
7
Paper holding lever (L) unit
Paper holding spring
Paper holding spring
Paper holding lever spring
6
*Bottom View of the Frame Ass'y
Mount the L and R paper holding springs between the respective
spring holders of the paper holding lever unit and frame, making
sure the opening of the spring hooks face outwards.
x2
RE(l.5)
"Bottom View of the Frame Ass'y
Paper holding lever shaft
Paper guide
Paper holding lever
(L)
and (R) units
RE(1.5)
x1
5
Frame R
c:>
Paper holding
lever
shaft
4
Insert the
paper
holding lever shaft (the side without the RE hole)
into the shaft hole
@
of frame L from the arrow direction
(i).
At
the same
time,
mount the paper holding lever (L)
unit.
Next,
insert side R (the side with the RE hole) of the
paper
hold-
ing
lever
shaft
into the shaft
hole of frame R from
the
arrow
dir-
ection
Cl),
mounting the paper holding
lever
(R)
unit
in a
similar
manner. After completing the above operation, mount the
type-E retaining ring
(RE)
on the right side of the paper holding
lever shaft then tighten the
ring.
ASSEMBLY DETAIL
PART NAME
ASSEMBLY
STEP
-
CE-140P

Advertisement

Table of Contents
loading

Table of Contents