Planning; Compatibility - Siemens FDCW221 Technical Manual

Radio gateway, radio smoke detector, manual call point, radio base
Hide thumbs Also See for FDCW221:
Table of Contents

Advertisement

4 Planning

4.1 Compatibility

Building Technologies
Fire Safety
When planning a project, proceed as follows:
Use a suitable radio test set to measure the local radio wave propagation (field
strength measurement) in the building.
Plan how to split the radio coverage into individual radio cells.
You will need this information for the number and positioning of the radio
gateways.
Note requirements in standards (e.g. fire sectors according to EN 54, local
specifications etc.).
The radio gateway may only be operated on a loop in the FDnet. Since the radio
gateway and connected radio detectors form a stub, this configuration must never
be used in stub operations. If it is, an impermissible 'stub-on-stub' topology will
result.
See also
2 Radio test set DZW1171 [➙ 47]
2 Defining the place of mounting [➙ 47]
2 Transmission field [➙ 45]
Compatible with control panels that support the FDnet detector line.
You will find detailed information in the 'List of compatibility'.
The table below shows the compatibility of the devices with various control panels:
Detector line
FC20xx
FDnet
C-NET
X = compatible
– = not compatible
Control panel
FC72x
X
Planning
Compatibility
SIGMASYS
AlgoRex
X
X
009865_m_en_--
2015-11-06
4
43 | 82

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smf6120Smf121Dow1171

Table of Contents