INTRODUCTION

A summary of the System 57 controller installation procedures is
shown below:
a.
Unpack and check the equipment.
b.
Identify a suitable location and check the cabling requirements.
c.
Confirm the power supply requirements.
d.
Install the Cabinet, 19" Mounting Frame or Panel Cutout as required.
e.
Fit the System 57 rack into the Cabinet, 19" Mounting Frame or
Panel Cutout.
f.
Install the sensors and wire back to the System 57.
g.
Check, and if necessary reconfigure, the Single Channel Control
Cards.
h.
Wire the sensors to the Field Interface/Relay Card terminal blocks.
i.
Wire the outputs from Field Interface/ Relay Card terminal blocks.
j.
Wire the power supply to the DC Input Card.
After installation is complete perform the commissioning procedures
outlined in Chapter 5.
The following sections of this chapter provide a detailed explanation of
the installation operations.