Sharp SX 1075 Service Maintenance Manual page 141

Table of Contents

Advertisement

LINEAR BEARINGS (con't)
2. Remove the left and right sealer guide guards
identified in Figure 3-303.
Sealer Guard- Left
Figure 3-303. Left and Right Sealer Guards
3. Move the pressure jaw to its completely
extended position by pulling it out by hand.
4. Locate the right linear bearing mounting screws
and remove (Figure 3-304). Take the spacer
from the top of the linear bearing, and slide out
of the machine. The linear bearing can now be
slid off the guide rail and out of the machine to
the rear.
Figure 3-304. Right Linear Bearing
SX™
Service and Maintenance Manual
SEALER ASSEMBLY
Sealer Guard- Right
Slide This
Direction
SECTION 3 – COMPONENT REPAIR
5. Install the new linear bearing by sliding on the
end of the guide rail, replacing the spacer, and
reinstalling the four mounting screws.
6. Remove the four mounting screws for the left
linear bearing. Take the spacer from above the
bearing. Slide to the rear of the machine along
the rail to free the linear bearing from the
machine (Figures 3-305 and 3-306).
Figure 3-305. Left Linear Bearing Screws
Figure 3-306. Left Linear Bearing Removal
3-121
Slide This
Direction
960714-02B © 2007 I2407

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sx 1097Sx 1099Sx 1109Sx 1121Sx 1084Sx 1108

Table of Contents