Mitsubishi Electric FX5UC-96MT/D User Manual page 62

Melsec iq-f fx5uc series
Hide thumbs Also See for FX5UC-96MT/D:
Table of Contents

Advertisement

CC-Link IE field network Basic remote I/O
Remote I/O points that are used in CC-Link IE field network Basic are calculated as "number of occupied stations  64 points".
Maximum number of CC-Link IE field
network Basic remote I/O points
384 points
CC-Link remote I/O
The number of remote I/O points to be used in CC-Link are calculated as "number of remote I/O stations × 32 points".
Even if using less than 32 remote I/O points, calculate as "number of remote I/O stations × 32 points."
Maximum number of
CC-Link remote I/O points
• FX5-CCL-MS (master station)
384 points
• FX3U-16CCL-M
256 points
AnyWireASLINK remote I/O
The number of I/O points set below is assigned to the remote I/O to be used with AnyWireASLINK.
• FX5-ASL-M: Set with the engineering tool parameters.
• FX3U-128ASL-M: Set with the rotary switch on the FX3U-128ASL-M main body.
For details, refer to the following manuals.
MELSEC iQ-F FX5 User's Manual (ASLINK)
FX3U-128ASL-M User's Manual
Maximum number of
AnyWireASLINK remote I/O
points
• FX5-ASL-M
384 points
• FX3U-128ASL-M
128 points
4 SYSTEM CONFIGURATION
60
4.3 Limitation on the Number of Input/Output Points
Actually used CC-Link IE field network Basic remote I/O points
(a)
(a) CC-Link IE field network
Basic remote I/O points
Actually used CC-Link remote I/O points
(b)
(b) CC-Link remote
I/O points
=
AnyWireASLINK remote I/O
(c)
(c) Number of remote I/O points assigned to
AnyWireASLINK master
stations
=
The total number of number of
occupied stations
×
32 points
station
The total number of the remote I/O
stations × 32 points
points
64 points
64 points

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents