Download Print this page

Run The Calibration Software; Start The Program; Installation Tab - Philips CCK4602 User Manual

Cmnd & calibrate
Hide thumbs

Advertisement

Table of Contents

6.5 Run the calibration software

6.5.1

Start the program

Before you start the calibration warm up the monitor(s) for minimum 1 hour
Start the calibration software CMND & Calibrate
6.5.2

Installation tab

In the "Installation" tab select your COM-port number
The software will check automatically the communication to the monitors via RS232 (make
sure the setting is correct in all monitors), the EDID information will be read via the video
signal cable.
The probe (color sensor) connection is checked via USB
All 3 parameters must be green:
o Display DVI/HDMI/D-port: read "PHL" from the EDID table
o Display communication: read model name via RS232
o Probe connectivity: check the color sensor
- 8 -

Hide quick links:

Advertisement

Table of Contents
loading

  Related Manuals for Philips CCK4602