Installation Procedure - Siemens Sinamics G110M Original Instructions Manual

Distributed converter for simogear geared motors.
Hide thumbs

Advertisement

Installation procedure

Having dismantled the SINAMICS G110M Terminal Housing, the following procedure should
be performed to complete the installation of the whole system.
1.
Star and Delta Configuration
Configure the motor terminals for either star or delta configuration
depending upon the voltage requirement of the application and the
mains input voltage.
2.
Fit the earth cable to the motor
1. Secure the earth cable to the motor terminal box.
2. Ensure that the cable is facing in the correct direction to allow
connection to the earthing post on the terminal housing.
Note:
The earthing cable is supplied with the terminal housing.
On the FS80/90 terminal housings there are two additional fixing
points which are the earthing points between the terminal housing
and the motor. These earthing points must be used and therefore,
the earthing cable does not need to be fitted.
If the SINAMICS G110M is ordered as a complete system, then
all mechanical and electrical installation is completed in the facto-
ry prior to delivery.
SINAMICS G110M Operating Instructions
Operating Instructions, 04/2015, FW V4.7.3, A5E31298649B AD
Installation
4.2 System Installation
43