R650 series.
also covers 650 chrome variant (12 pages)
Summary of Contents for Redring Active 350S
Page 1
REDRING ACTIVE 350S SMART TECHNOLOGY ELECTRIC SHOWER Installation and User Guide IMPORTANT: This booklet should be left with the user after installation and demonstration...
HOW TO USE YOUR ACTIVE 350S SHOWER (DETAILED) 1. Ensure the electricity and water are turned on to the unit. 2. Your shower has 3 power settings selected by turning outer knob “A”. The most popular is “ There are also options for a “...
HOW YOUR ACTIVE 350S SHOWER WORKS 1. Water is heated instantaneously as it flows over the heating elements in the copper cylinder (diagram 2). 2. The heaters are only switched on when sufficient water is flowing. This is done automatically with a switch which works...
HOW TO MAINTAIN YOUR ACTIVE 350S SHOWER It is recommended that the shower unit and hose etc. be cleaned using a soft cloth and that the use of abrasive or solvent cleaning fluid be avoided. We recommend that before any cleaning, the isolating switch be turned off, thus avoiding accidentally switching on the shower.
Check circuit through shutdown PCB. If defective then replace. turned. Power supply not reaching shower. REDRING AFTER SALES SERVICE We offer a technical advisory service on the telephone to contractors and other customers with problems in the field. RING 08709 000430 (UK ONLY)
HOW TO INSTALL YOUR ACTIVE 350S SHOWER WARNING: ALL WIRING AND INSTALLATION MUST BE SUPERVISED BY A SUITABLY QUALIFIED PERSON. WARNING: DO NOT INSTALL THIS SHOWER WHERE IT MAY BE SUBJECTED TO FREEZING CONDITIONS We recommend that the installation is done in the following sequence.
Page 8
Blockage in the water ways (particularly the handset and solenoid valve) will prevent the heater working properly. 7. The shower is designed to have an open outlet and should only be used with ”Redring” recommended fittings. Do not connect the handset until after the shower front cover and corner section are fitted.
Page 9
c) ELECTRICAL WARNING: THIS SHOWER MUST BE EARTHED. The electrical installation must be in accordance with the current BS.7671 (IEE Wiring Regulations) and “Part P” of the Building Regulations and/or local regulations 1. The SHOWER is designed for a single phase AC electrical supply. Please check the rating plate on the unit to see what details apply to your unit.
Curtain and Rail Pack with Non-Slip Mat Additional accessories and spare parts can be supplied against any Credit or Debit cards from Redring Sales Hotline 08709 000420 (medium)” position. (stop)” position. Cat No. 83792578 Front Cover Cat No. 93792452 Tank-Base Assy (7.2kW) Cat No.
GUARANTEE AND CONTACT DETAILS Full details of terms and conditions are available on request from:- APPLIED ENERGY PRODUCTS LIMITED MORLEY WAY, PETERBOROUGH PE2 9JJ TEL: +44 (0) 1733 456789 FAX: +44 (0) 1733 310606 Website: www.redring.co.uk...
HOW TO USE YOUR ACTIVE 350S SHOWER (SUMMARY) 1. Ensure the electricity and water are turned on to the unit. 2. Turn outer knob “A” clockwise to the “Power Select” position of your choice. The water will flow, and the neon indicator light will glow.
Need help?
Do you have a question about the Active 350S and is the answer not in the manual?
Questions and answers