Procedure – from planning to initial
operation
In this chapter
Goal
ET 200 Distributed I/O System
EWA 4NEB 780 6000-02a
This chapter offers an overview of the procedure in the ET 200 distributed
I/O system. This chapter is intended primarily for readers who as yet have no
experience with the ET 200.
It is in the nature of a quick reference for the rest of the manual, beginning
with planning and continuing through cabling, parameterization with
COM ET 200 Windows, generation of the STEP 5 application program and
on to initial operation.
Section
2.1
Planning the layout
2.2
Structuring the ET 200 distributed I/O system
2.3
What to consider before parameterization with
COM ET 200 Windows
2.4
Parameterization with COM ET 200 Windows
2.5
Writing the STEP 5 application program
2.6
Initial operation of ET 200
After reading this chapter, you should be familiar with the outlines of the
procedure for the distributed I/O system and know where to look for
additional information in this manual.
Topic
2
Page
2-2
2-3
2-4
2-6
2-8
2-9
2-1