Replacing Components
Operation Panel
This component is not hot replaceable.
i
At the rear of the storage subsystem, switch off the power supply units
using their power switches.
Remove the AC cord clamps and remove the leads.
Remove the flange cover capping the operation panel.
Record the slot positions of the disks to be removed in the next step.
i
Remove some disks nearest to the operation panel in order to have
free mounting place for unscrewing the operation panel.
Operation panel
Figure 28: Screw to be loosened for removing the 2.5" operation panel
Cisco C880 M4 Storage Subsystem Operating Manual for Server with E7-8800 v3 CPU
Operation Panel
47