Pre-Operation Instructions; Unpacking And Product Confirmation - Mitsubishi Electric FR-A8ND Instruction Manual

Plug-in option devicenet communication function
Table of Contents

Advertisement

1

PRE-OPERATION INSTRUCTIONS

1.1

Unpacking and product confirmation

Take the plug-in option out of the package, check the product name, and confirm that the product is as you ordered and intact.
This product is a plug-in option for the FR-A800/F800 series inverter.
 Product confirmation
Check the enclosed items.
Plug-in option............................1
X10
0
MNS
X1
0
ON
1 2
Earth plate................................1
(Refer to
page
13)
NOTE
• DeviceNet is a registered trademark of ODVA (Open DeviceNet Vender Association, INC).
6
PRE-OPERATION INSTRUCTIONS
Mounting screw (M3 8 mm)...3
(Refer to
page
13)
Terminal block..........................1
(Refer to
page
21)
Spacer......................................2
(Refer to
page
13)
Communication option LED
display cover............................1
(Refer to
page
12)

Advertisement

Table of Contents
loading

Table of Contents