Installation; Unpacking Procedures; Transportation Procedures; Transporting Cr750/Cr751 Controller - Mitsubishi Electric CR750-D Instruction Manual

Industrial robot
Hide thumbs Also See for CR750-D:
Table of Contents

Advertisement

2Unpacking to installation

2.2 Installation

2.2.1 Unpacking procedures

The controller is shipped from the factory packaged in cardboard.

2.2.2 Transportation procedures

The following shows how to transport the controller.

(1) Transporting CR750/CR751 controller

CR750 controller
Mass:
Approx. 16 - 18kg
Fig. 2-1 : Transporting CR750/CR751 controller
1) Slightly tilt the controller and put your hands underneath. Providing steady support with both hands, lift it up
and transport.
Be careful not to trap fingers when transporting the controller.

(2) Transporting CR760 controller

Mass:
Non-CE marking: Approx. 95kg
CE marking specification: Approx. 296kg
Fig. 2-2 : Transporting CR760 controller
1) Two workers must transport the controller using a crane or lifter.
2-8 Installation
CR751 controller
Mass:
Thin type: Approx. 12kg
Heavy type: Approx. 15kg
Wire
Eye bolt
<Non-CE marking>
<CE marking>

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr751-qCr760-dCr750-qCr751-d

Table of Contents