1
Introduction
This user's guide describes the characteristics, operation, and use of the TSC2013 evaluation module
(EVM). This EVM, featuring the TSC2013 resistive dual-touch controller, is a fully-functional USB-powered
platform that allows 4-wire resistive touch-screen panels to be connected to the USB port of a PC or
laptop for evaluation. A complete circuit description, schematic diagram, and bill of materials are included
in this document.
The following related documents are available through the Texas Instruments web site at www.ti.com.
The following lists devices and corresponding device data sheets of devices that are compatible with this
EVM:
•
TSC2013,
SLVSC89
•
DRV2605,
SLOS825
•
REG1117-33,
SBVS001
•
MSP430F247,
2
EVM Overview
2.1
Features
The TSC2013EVM is a complete evaluation and demonstration kit that includes a USB-based board and
evaluation software for use with a personal computer running Microsoft Windows® operating systems
(OS).
3
Analog Interface
The TSC2013EVM is designed for easy interfacing to 4-wire resistive touch screen panels.
PIN NUMBER
J300.1
J300.2
J300.3
J300.4
SLVUA92 – July 2014
Submit Documentation Feedback
SLAS547I
Table 1. Analog Interface Pinout
SIGNAL
Y–
X–
Y+
X+
Copyright © 2014, Texas Instruments Incorporated
TSC2013EVM User's Guide
DESCRIPTION
Touch screen Y- electrode
Touch screen X- electrode
Touch screen Y+ electrode
Touch screen X+ electrode
User's Guide
SLVUA92 – July 2014
TSC2013EVM User's Guide
1
Need help?
Do you have a question about the TSC2013EVM and is the answer not in the manual?
Questions and answers