Preparation

The list below outlines the basic process of pre-
paring your machine for operation. Specific steps
are covered later in this section.
The typical preparation process is as follows:
1.
Unpack the lathe and inventory the contents
of the box/crate.
2.
Clean the lathe and its components.
3.
Identify an acceptable location for the lathe
and move it to that location.
4.
Mount the lathe on the stand and bolt it to the
floor.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the lathe is ready for operation.
6.
Check lathe for proper lubrication.
7.
Connect the lathe to the power source.
8.
Test run lathe to ensure it functions properly.
9.
Perform the spindle break-in procedure to
prepare the lathe for operation.

Unpacking

This machine was carefully packaged for safe
transport. When unpacking, separate all enclosed
items from packaging materials and inspect them
for shipping damage. If items are damaged,
please call us immediately at (570) 546-9663.
IMPORTANT: Save all packaging materials until
you are completely satisfied with the machine and
have resolved any issues between Grizzly or the
shipping agent. You MUST have the original pack-
aging to file a freight claim. It is also extremely
helpful if you need to return your machine later.
Model G4003G (Mfd. Since 1/15)

SECTION 3: SETUP

SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.

Needed for Setup

The following are needed to complete the setup
process, but are not included with your machine.
For Lifting and Moving:
— A forklift or other power lifting device rated
for at least 2000 lbs.
— Two lifting straps rated for at least 2000
lbs. each
— Lifting chain and safety hook rated for at
least 2000 lbs. each
— Another person to guide machine
For Power Connection:
— A power source that meets the minimum cir-
cuit requirements for this machine (review
Power Supply on Page 13 for details)
— An electrician or qualified service person-
nel to ensure a safe and code-compliant
connection to the power source
For Assembly:
— Shop rags
— Cleaner/degreaser (see Page 17)
— Quality metal protectant lubricant
— Safety glasses for each person
— Anchoring
hardware
(see Page 22)
— Precision level at least 12" long
— Silicone sealant
as
needed